Production (single operator): 1 plant / 1-5 minutes
Wet Trim and Hybrid Trim Method:
average throughput for every Bud Bucker with a single operator should be 20,000 grams (44 lbs.) per hour of fresh flower or 5,000 grams (11 lbs.) per hour of dried finished buds.
Dry Trim Method:
The average throughput for every Bud Bucker with a single operator should be 2,500 grams (5.5 lbs.) per hour of the dried finished flower.